DC Network Rail



Wimbledon TIS Switch Installations

  • Track drilling and bushing
  • Fit new hook switches
  • Ductor tested new installation

Catford Substation TIS Switch Installations to include:

  • Track drilling and bushing
  • Terminations to the Conrail and track switches

Belvedere TIS Switch Installations to include:

  • Track drilling and bushing
  • Terminations to the Conrail and track switches


HV Network Rail


Wessex and Sussex Feeder Renewals

  • 9 x 33kv feeder installations
  • Pilot Cable Changeovers
  • Electrical Testing
  • Delivery of 21 Miles of New Cables
  • Decommissioning for recovery 21 miles of Oil Filled Cable

Substation and Switchgear Upgrades to the following sites:

  • Bentley
  • Ashford
  • Pirbright
  • Whyteleaf South
  • Woking
  • Kevingtown
  • Eynsford
  • Teddington
  • Polhill
  • Lancing
  • Tweed Hill
  • Normans Bay
  • Fishbourne
  • Mitcham Junction
  • Tattenham Corner
  • Preston Park
  • Tulse Hill
  • Norbiton
  • Worchester Park
  • Brentford

Brighton to Hove

  • 33kV Feeder renewal
  • Pre-commissioning jointing
  • Terminations
  • Fault location
  • Pilot joints
  • Testing closing joints and terminations

33kv Raft Modifications

We designed bespoke copper tubing clamps for the HV cables terminations and arranged manufactured. We also installed modifications to the insulated pots, to our client’s individual requirements, plus installed all cable supports and containment. These rafts were located at

  • Shoreham
  • Hassocks
  • South Croydon
  • Pirbright
  • Woking

Oil filled cable Hot Splicer Installation locations

  • Three Bridges 33kV
  • Balham 33kV
  • Ashtead 33kV (two installed)
  • Newhaven (two installed)
  • Newhaven (one installed for Network Rail HV maintainer)
  • Pirbright 33kV (three installed)
  • Woking 33kV (two installed)
  • Swanley 33kV (one installed)
  • Polhill 33kV
  • Tweed Hill 33kV (two installed)
  • Eynsford 33kV (two installed)
  • Farnham 33kV
  • Farncombe 33kV (two installed)
  • Grayswood 33kV
  • Liss 33kV

From Dartford Substation to Stone Crossing Substation

  • 33kV Feeders 606 + 608 Cable Jointing & Terminations
  • Pre-commissioning Testing & Decommissioning 2 oil feeders
  • Pilot Cable Installation & pre-commissioning

From Three bridges Switching Station to Balcombe Substation

  • 33kV Feeder 3060 + 3061 part renewal
  • Cable Jointing and Terminations
  • Pre-commissioning testing and decommissioning
  • To include pilot works and change overs

Woldingham Substation

  • All pre-commissioning testing of the new 11kV and 33kV HV cables
  • Installation of all terminations to the new switch gear and transformers
  • Completed closing joints on track under night isolations to energise the new building.

Eden Substation

  • All pre-commissioning testing of the new 11kV and 33kV HV cables
  • Installation of all terminations to the new switch gear and transformers.
  • Completed closing joints on track under night isolations to energise the new building.

Lingfield Substation

  • All pre-commissioning testing of the new 11kV and 33kV HV cables
  • Installation of all terminations to the new switch gear and transformers
  • Completed closing joints on track under night isolations to energise the new building

Staines Substation

  • 33kV Separable Connectors to 1 x New Transmag Transformer
  • Trifurcation Joint installed on existing PILC Cable to rectifier breaker

Hampton Substation

  • 33kV Separable Connectors to 1 x New Transmag Transformer
  • Pfisterer size 3 terminations completed to rectifier breaker

Barnes Substation

  • A bank of new switch gear installed in the existing substation building
  • Removal of the old equipment
  • Carried out 33kV Terminations to switch gear and transformers on change overs and isolations

HV London Underground



LUL SSR Power Upgrade Package 4

  • 11kV & 22kV Feeder renewals on London underground.
  • Pre-commissioning the newly installed HV cables within the tunnels and through station platforms on night possessions.
  • Installation of 11kV & 22kV straight joints and trifurcation joints along with phasing end to end at each substation.

Finchley Road Substation

  • Installation of all 11kV and 22kV Terminations and Joints to new and old switch gear to include switch gear end box modifications
  • PILC to XLPE joints and terminations to transformers.

Harrow on the Hill Substation

  • 11kV End box Modification to rectifier breakers compound filled boxes.
  • Termination to transformers and rectifier transformers.

Naesden BSP

  • Various 11kV & 22kV Terminations within the Substation and around site.
  • 250 plus terminations and joints installed here.

Harrow Substation

We worked alongside Pfisterer Engineers to agree an electrical design for the termination of new Pfisterer cables. The switchgear being used was previously installed on a wind farm and had to be expertly adapted to fit the restricted space at Harrow Substation. We implemented electrical principles with stress areas and, with our experience of the terminations, were able to build up and adapt the non-standard earthing arrangements within the termination measurements to enable a way forward.

Neasden Traction Substation

  • Installation of all 11kV and 22kV Terminations and Joints to new and old switch gear to include switch gear end box modifications
  • PILC to Xlpe joints and terminations to transformers.

DC London Underground



LUL Batch 1 & 2

  • Terminated DC within cabinets on the positive and negative busbars
  • Commissioned busbars into service
  • Exclusively allowed to sweat lugs onto 935mm2 underground cable from LUL Maintainer

Uxbridge DC Track Works

  • Terminated DC cables within cabinets on the positive and negative busbars to include track connections
  • Commissioned busbars into service

Rickmansworth DC Track Works

  • Successfully terminated DC cables within cabinets on the positive and negative busbars to include track connections
  • Commissioned busbars into service

Barking Sidings

  • Successfully terminated DC cables within cabinets on the positive and negative busbars to include track connections
  • Commissioned busbars into service
  • DC switch gear modifications completed at this site also

Solar Farm Cable Jointing



Installations of 11kV Cable Terminations and Joints at various locations listed below in the UK:

  • Somerset
  • Southampton
  • Silverstone
  • Pyworthy
  • Little Travease

33kV Cable Terminations Testing & Pre-Commissioning at various locations listed below in the UK:

  • Bobbing
  • Staining Wood
  • Bedborough
  • Caswell

Installations of 66kV Cable Terminations, Joints & Pre Commissioning Testing at various locations listed below in the UK:

  • Usk


Wind Farm Cable Jointing


Gwynt Y Mor
HV Cable Terminations to turbines and offshore substations at 33kv.

Global Tech 1
Fibre Optic Jointing to turbines and offshore substations.

London Array
Inspections to HV Terminations installed on turbines and offshore substations at various voltages 33kV to 150kV creating progress reports and overseeing contractors quality of works to include testing inspections.

APS know exactly the problems in this environment and can provide assistance to Tier 1 Contractors or sub-contractors in the installation of Terminations, Inspections, Testing and Commissioning.

Passenger Ship Cable Termination



Grand Princess Passenger Ship

6.6Kv Cable Terminations installed to switch gear and terminations to back up generators.


Commercial Network Termination



Winchester House

11kV Cable Terminations into switchgear and transformers.

Hydro Power


Rheidol Hydro Power Station 33kV Transformer Cables

Works were to investigate the current state of two 33kV transformer cables & the condition of the current HV route. This involved the following works:

  • Ecological Survey
  • Tree Clearance
  • Topography Survey
  • Excavation Works
  • Feasibility Study