66kV Crimscote Solar Farm Terminations
66kV Crimscote Solar Farm Terminations
The Challenge:
- Advanced Power Services was appointed to deliver the installation of three 66kV 3M QTEN cold-shrink terminations, alongside the connection of a 300 mm² bonding leads from the cable lead sheath to the earth mat via a cable link box.
- The scope required expert terminating of High-Voltage terminations, precise earthing connections, and strict adherence to manufacturer and industry standards to ensure the long-term safety, performance, and reliability of the Solar Farm’s grid connection.
The Results:
- Advanced Power Services successfully completed all terminations, and earthing works to the highest standards, delivering a QECC 20-Year Guarantee for the installed terminations
- A comprehensive termination record was produced, including preparation photographs, detailed measurements, confirmation of full compliance with the manufacturer’s instructions, and full traceability through recorded manufacturer lot numbers.
- In addition, detailed Jointing and Testing sheets were provided at the conclusion of the works, ensuring a complete, auditable handover package and giving the client full confidence in the quality, compliance, and longevity of the installation