Transformer Degasification and Maintenance
A transformer is the most costly and essential piece of equipment within an electrical substation. It is desirable to perform various preventative maintenance activities to ensure the transformer maintains a high level of performance and has a long functional life. Oil samples and inspection can provide a vast resource of interesting information on the condition of a transformer and the presence and/or build-up of combustible gases. Poor gases can contribute to faster life expiry in equipment and in some cases, inefficiency costing more to run. When test results show the presence of combustible gases, this often indicates a fault in the transformer subject to results and/or poor maintenance. Investigation is recommended, which would eventually include degassing the fluid and restoring your transformer to a new baseline.
Monthly Check up (Option 1)
Includes Temperature – Oil Level – Leaks – Silica Gel Breather checks– Gel to be recharged by heating unit until correct service colour is attained. This check can be done safely while the transformer remains in service. If liquid level has decreased abnormally, we would isolate the HV and LV Connections to the transformer and identify the source of the oil leak and advise the client on the repair requirements and the costs with full transparency. Once the repairs are carried out, we would refill the oil and re-energise the transformer.
Maintenance Contracts Annual Check up (Option 2)
In addition to the items given in monthly check-up above, the following checks must be carried out. – oil sampling, checking break down value this is normally 30kv and laboratory tests (to be taken from the oil sampling valve) – checking for condition of bushings for cleanliness and cracks if any, and any PD on the MV side of the transformer as well as checking Silica Gel Breather.
Cable Degasification Services and De-Commissioning
Advanced Power Services are very experienced in electrical degasification. Alongside our fluid jointing services we can also provide cable degasification that includes Low Oil Pressure Alarm Checks and maintenance including general repairs, for more information please contact us.
Cable Decommissioning and Recovery
Advanced Power Services offers fluid filled cable decommissioning using a range of techniques, these being but not limited to, nitrogen, air and gel we also provide oil sampling for PCBs and disconnection of fluid filled tanks for recovery.