132kV-joint-fault-investigation-case-study-header

132kV Joint Fault Investigation Case Study

132kV joint fault investigation-1

132kV joint fault investigation (Scotland) for MPCJ Ltd.

Challenge:

Due to the known expertise which Advanced Power Services hold in 132kV Jointing techniques we were asked to help with the investigation into the failure of the joint.

Result:

The joint was cut out of the circuit and moved to a safe location to start the investigation.

It was dismantled in the same order as it would have been assembled.

Each stage was photographed with the client present and any findings recorded.

Contact us today

View all case studies