Great Western Electrification Project Case Study
Works carried out at the following sites for UKPN.
Works carried out at the following sites for UKPN.Foxhall Junction – 72 terminations
Christian Malford – 24 terminations
Hullavington – 24 terminations
Uffington – 24 terminations
Radley – 24 terminations
Reading – 72 terminations
Royal Wotton Bassett – 72 terminations
Swindon – 54 terminations
Shrivenham – 24 terminations
St Brides – 24 terminations
Tywford – 24 terminations
Theale – 24 terminations
Little Somerford – 24 terminations
Maindee – 24 terminations
Pangbourne – 54 terminations
Cholsey – 54 terminations
Works undertaken on all the above sites were;
- 400m² Cu 52kV rated outdoor 3M terminations fitted to SMOS Pallets and 52kV Pfisterers connected to Transformers on site
- 120mm² Raychem terminations for the neutrals
- On some of the sites 52kV rated 3M straight joints were completed
- APS assisted the UKPN test engineers with the testing of the cables