The Challenge:
- As part of the South Fambridge Hall Solar Farm grid connection, Advanced Power Services was appointed to deliver the installation of 132kV overhead line to underground (OHVT) Raychem terminations.
- The works demanded absolute precision, expert High-Voltage jointing knowledge, and strict adherence to safety and quality standards, all within a tightly coordinated construction programme.
The Result:
- The 132kV termination works were completed successfully to the highest industry standards, supporting the timely energisation of the Solar Farm.
- Our structured delivery, attention to detail, and collaborative working approach ensured a smooth project execution and reinforced Advanced Power Services’ reputation as a trusted partner for complex High-Voltage Infrastructure projects.