Works carried out at the following sites for UKPN.

Works carried out at the following sites for UKPN.

Foxhall Junction – 72 terminations

Christian Malford – 24 terminations

Hullavington – 24 terminations

Uffington – 24 terminations

Radley – 24 terminations

Reading – 72 terminations

Royal Wotton Bassett – 72 terminations

Swindon – 54 terminations

Shrivenham – 24 terminations

St Brides – 24 terminations

Tywford – 24 terminations

Theale – 24 terminations

Little Somerford – 24 terminations

Maindee – 24 terminations

Pangbourne – 54 terminations

Cholsey – 54 terminations

Works undertaken on all the above sites were;
  • 400m² Cu 52kV rated outdoor 3M terminations fitted to SMOS Pallets and 52kV Pfisterers connected to Transformers on site
  • 120mm² Raychem terminations for the neutrals
  • On some of the sites 52kV rated 3M straight joints were completed
  • APS assisted the UKPN test engineers with the testing of the cables