Great Western Tunnel Works, Electrification Case Study
The Severn rail tunnel was closed to all rail traffic which allowed for major refurbishment works to be carried out.
Works undertaken were 400mm² Cu Raychem 52kv rated inline straight joints (shield break joints) completed at the roof of the Severn tunnel.
All works were carried out from MEWPs and light weight towers.
The team all had their PASMA certificates so were able to work from the towers, dismantle and rebuild where required.