Renewable and Utility Sectors Lower House Farm Case Study

Renewable and utility sectors-1

Lower House Farm Solar Array. Usk. 66kV Cable Jointing and Terminating for G2 energy.

The Works undertaken at Lower House Farm Solar array site were 400m² Cu 66kV outdoor terminations fitted to an outdoor raft and 66kV Prysmian inline joints which ran from the solar farm to the overhead line connection.

  • 66kV Prysmian inline joints which ran from the solar farm to the overhead line connection
  • 66kV inline joints made off in a trench
  • 66kV connections to the National Grid Raft
  • 400m² Cu 66kV outdoor terminations fitted to an outdoor raft